Posts for SWW

Clean Sweep 1992 – laying the pipe out to sea

In the 1990’s South West Water carried out a multi- million pound program to upgrade the sewage systems and improve the bathing water quality of many west country towns; in […]

More info

Clean Sweep 1992 – laying the pipeline out to sea

South West Water’s Clean Sweep 1992 program – laying the finished pipeline in a prepared trench out to sea.

More info

Clean Sweep 1992 – assembling the pipes in Summerleaze car park

South West Water’s 1992 Clean Sweep program – Summerleaze beach car park: assembling the pipes in sections of several hundred metres, ready for these to be joined together and fed […]

More info

Clean Sweep 1992 – assembling the pipes in Summerleaze car park.

South West Water’s 1992 Clean Sweep program – Summerleaze beach car park: assembling the pipes in sections of several hundred metres, ready for these to be joined together and fed […]

More info

Clean Sweep 1992 – the pipes and the pumping station

This shot shows the construction of the underground pumping station, next to the Castle, with the ends of the pipeline sections in Summerleaze beach car park. A temporary footbridge joins […]

More info

Clean Sweep 1992 – digging through the breakwater

Here is a view of the trench being dug through the breakwater, at its landward end, to accommodate the pipeline on its way out to sea. This was followed by […]

More info

Clean Sweep 1992 – digging the trench outto sea

This shows one of the long-armed diggers, mounted on a barge, digging the trench out to sea to accommodate the pipeline. Explosives were used to break up the rock in […]

More info

Clean Sweep 1992 – the completed pipeline stretches across Summerleaze beach

The pipeline, now assembled and joins, is fed through large supports – each having a wheeled runner at the top – across Summerleaze beach. It was then fed into a […]

More info

Clean Sweep 1992 – assembling the complete pipeline

This shows the lengths of pipe – each several hundred metres long – being assembled into one continuous pipe, which is fed across Summerleaze beach and out to sea – […]

More info

Clean Sweep 1992 – the pipeline stretches across Summerleaze beach

The assembled pipeline passing, on its wheeled trestles, across Summerleaze beach and out to sea.

More info